Back to all podcasts

Episode 0047

Summary

The audio features a business meeting where participants discuss a manufacturing plan aimed at increasing cost efficiency due to the credit crunch and global financial crisis. The core strategy involves implementing a Just-In-Time philosophy. Key discussion points include reducing both production and delivery lead times through measures like optimizing workstation proximity, managing job queues, improving coordination, and fostering closer supplier relationships. Additionally, the plan emphasizes a zero-defects quality program, advocating for quality control at the source and empowering workers with responsibility and authority to halt production if issues arise. All speakers agree on the necessity of these measures to reduce errors and enhance overall efficiency.

00:00 00:00

Transcript (Click timestamp to jump)

00:09 Speaker 1

I called this meeting today in order to discuss our manufacturing plan. As I'm sure you're all aware, with the credit crunch and the global financial crisis, we're obligated to look for more cost-efficient ways of producing our goods. We don't want to have to be looking at redundancies, so we've outlined a brief plan to implement the Just-In-Time philosophy.

00:30 Speaker 2

We have two basic points that we want to focus on. First of all, we want to reduce our lead time.

00:36 Speaker 3

Why would we want to do that? I think this is not an area that really needs to be walked on.

00:42 Speaker 2

Well, we want to reduce production and delivery lead times for better overall efficiency.

00:46 Speaker 1

Right. Production lead times can be reduced by moving workstations closer together, reducing queue length, like, for example, reducing the number of jobs waiting to be processed at a given machine, and improving the coordination and cooperation between successive processes.

01:03 Speaker 1

Delivery lead times can be reduced through close cooperation with suppliers, possibly by inducing suppliers to locate closer to the factory or working with a faster shipping company.

01:15 Speaker 3

I see. That makes sense.

01:18 Speaker 2

The second point is that we want to require supplier quality assurance and implement a zero defects quality program. We currently have far too many errors that lead to defective items, and therefore, they must be eliminated.

01:30 Speaker 1

A quality control at the source program must be implemented to give workers personal responsibility for the quality of the work they do, and the authority to stop production when something goes wrong.

01:40 Speaker 3

I'm with you on this one. It's essential that we reduce these errors.

01:44 Speaker 4

We've got to force our suppliers to reduce their mistakes.

01:47 Speaker 1

Exactly. Well, let's look at how we're going to put this plan into action. First,